QubitLogic
Tracker

Quantum roadmap tracker

What each vendor has publicly committed to, and when. Every row links to the source it came from, with the date we last checked it.

2025 2026 2027 2028–29 2030+
IBM
Kookaburra: qLDPC memory paired with a logic unit Cockatoo: entanglement between modules Starling: 200 logical qubits, 100 million gates (2029) Blue Jay: ~2,000 logical qubits (2033)
IonQ
Tempo reaches #AQ 64 on 100 qubits Tempo shipments, 256-qubit demonstration 2M physical, 80,000 logical qubits (2030)
Quantinuum
Helios: 48 logical qubits, 99.921% two-qubit fidelity Sol: ~100 logical qubits, five-nines fidelity Apollo: hundreds of logical qubits, fault-tolerant

Vendor roadmaps as published. Last verified 25 Aug 2026. A filled dot is something shipped; an outline is a stated target.

By organisation

IBM

4 milestones
  1. 2026 Kookaburra: qLDPC memory paired with a logic unit Target source checked 25 Aug 2026
  2. 2027 Cockatoo: entanglement between modules Target source checked 25 Aug 2026
  3. 2028–29 Starling: 200 logical qubits, 100 million gates (2029) Magic state injection across modules demonstrated in 2028. Target source checked 25 Aug 2026
  4. 2030+ Blue Jay: ~2,000 logical qubits (2033) Target source checked 25 Aug 2026

IonQ

3 milestones
  1. 2025 Tempo reaches #AQ 64 on 100 qubits Shipped source checked 25 Aug 2026
  2. 2026 Tempo shipments, 256-qubit demonstration Target source checked 25 Aug 2026
  3. 2030+ 2M physical, 80,000 logical qubits (2030) Target source checked 25 Aug 2026

Quantinuum

3 milestones
  1. 2025 Helios: 48 logical qubits, 99.921% two-qubit fidelity Shipped source checked 25 Aug 2026
  2. 2027 Sol: ~100 logical qubits, five-nines fidelity Target source checked 25 Aug 2026
  3. 2028–29 Apollo: hundreds of logical qubits, fault-tolerant Target source checked 25 Aug 2026

How to read this

A roadmap is a claim about the future, not a result. Vendors revise them, usually quietly, and a date that slips rarely gets an announcement. Treat every outline dot as a statement of intent by the company that made it.

Not every vendor publishes dates. Google's roadmap is six numbered milestones with no years attached, so placing them in a year column would attribute a commitment they have not made. They are absent here for that reason rather than by oversight.

Something out of date? Tell us and we will correct it with a note saying what changed.